Asbestos Removal in Lakewood, California

At Lakewood Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

One-story house with cream stucco walls and a wood-clad entry section, a low gabled roof, trimmed shrubs, a front lawn and a leafy tree beside the curb.
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatement

Our asbestos services

Entry hall with a wooden staircase, small square patches taped to the ceiling and walls, and loose sample bags lying on the floor and the bottom step.Empty living room with a textured ceiling, plain white walls, beige carpet, a sliding glass door with curtains and a doorway leading to a hall.

Asbestos testing and surveys

Nothing is touched before the lab has spoken. A Cal/OSHA-certified asbestos consultant or technician collects the samples, the lab reports what is in them and the findings come to you in writing. We arrange the sampling and talk the report through with you.

Popcorn ceiling removal

A textured ceiling is sampled before a scraper goes near it. If asbestos shows up, we close off the room with plastic, bring the texture down and bag the debris for disposal. Patching, new texture and paint are separate work for your finisher.

Kitchen floor covered in square vinyl tiles in a faded rose and beige pattern, with wooden cabinets and a white range at the back and sunlight across the floor.Empty room with plastic sheeting along the walls and floor and a section of wall opened between two windows, showing rough plaster, wood framing above it and a white bag by the window.

Floor tile and mastic removal

Before a floor comes up, we have the tile, sheet vinyl and the black mastic under them tested. When a result is positive, we work in a sealed area and the flooring and glue leave in bags. Laying a new floor is separate work.

Drywall, joint compound and plaster removal

When a wall is going to open, the survey reaches into the wall and ceiling cavities as far as it takes to identify and sample what is there. Plaster, drywall or joint compound that tests positive is taken out in a sealed work area and leaves as bagged waste.

Attic with round silver foil-wrapped ducts running along the rafters, plank flooring, loose insulation along both sides and daylight from a small window at the far end.Empty room with clear plastic sheeting over the walls and windows, a wood plank floor and a light blue-gray portable air machine with a flexible hose.

HVAC duct and pipe insulation removal

The district’s rule counts replacing a furnace, an air handler or ducts as renovation, which puts the survey first. Positive duct wrap, tape or pipe insulation is taken out of the attic or furnace closet from a sealed work area, and new ducts are priced separately.

Renovation and demolition abatement

Remodels and teardowns both start with the district’s survey and notice rules. We take care of containment, removal and disposal for the asbestos the survey finds, and an independent consultant runs the clearance air test at the end.

Asbestos testing and removal costs

Nearly 9 in every 10 Lakewood homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Lakewood, Cerritos and Hawaiian Gardens. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

Sampling by a Cal/OSHA-certified consultant or technician, an accredited lab reading of each sample and one written report. The air test after removal is run by an independent consultant.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

The room covered in plastic with air filters running, the texture soaked and scraped into bags, a final cleanup and the haul. Skim coating, new texture and paint are extra.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The work area sealed, tile or sheet vinyl lifted, the black mastic beneath removed where it tested positive, bags hauled out and the room cleaned. A new floor is not included.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Plastic containment and air filters, the wall or ceiling material that tested positive removed wet, bagged and hauled, then a cleanup. New drywall and paint are separate.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed work area in the attic, closet or pipe run, positive wrap or tape removed and bagged, and a cleanup. New ducts or insulation are a separate price.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

The positive materials come out before the remodel or demolition crew begins, with containment, disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, positive stucco cut out wet, bagged and hauled, and a cleanup. New lath, stucco or siding is not included.

Get a free quote

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Whole pieces taken off by hand and kept wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding is extra, and roofing is priced after a roof visit.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Permits now filed with the City of Lakewood, California

Since November 1, 2025, permit applications in Lakewood go straight to the City of Lakewood. The asbestos notice is a different filing. It goes to a separate office, the South Coast Air Quality Management District, and it has a deadline of its own.

We file the notice online. Rule 1403 sets the deadline at no later than 10 working days before any demolition or renovation activities, and the district notification fee goes in with it. Every demolition needs the notice, while a renovation that removes less than 100 square feet of asbestos-containing material does not, in any type of building.

State law adds a step at the permit counter for demolitions, according to the district. When you apply for a demolition permit, the local building and safety office needs a copy of the notification sent to the district. For your own address, ask the City of Lakewood or call the district’s asbestos hotline, (909) 396-2336.

Houses from the 1950s

Just over 5 in every 10 homes in Lakewood date from the 1950s. With nearly 9 in every 10 homes built before 1980, the survey before demolition or renovation is the normal first step here, not an extra one.

The rule has no build-year cutoff, so a newer house or a later addition goes through the same survey. A survey is a record of the samples, where they were taken and what the lab found, and other materials the work reaches get sampled too.

Housing in Lakewood, California

Half of Lakewood’s homes were built in or before 1957, and about 3 in every 4 date from 1950 through 1979. More than 1 in 8 go back before 1950.

Only about 14 percent of Lakewood’s housing is in buildings with five or more units, while one-unit homes account for about 84 percent. Renters are about 29 percent of households, and the district’s single-unit rules treat apartments, townhouses and condos differently from houses.

Ceilings, ducts and the attic

Only a lab result tells you what a textured ceiling is made of. We sample it first, and we take it down as asbestos work only when the result calls for it.

When a furnace or air handler is going out, the survey goes in first. Renovation, in the district’s rule, includes installing or taking out heating, ventilation, air conditioning (HVAC) systems, and that holds for a Lakewood house as much as anywhere else in the district. The survey comes before the work, and the notice, where one is needed, follows.

Positive duct wrap, tape or pipe insulation in the attic is removed inside a sealed work area, and the waste leaves bagged. Priced separately from all of this are new ducts and fresh insulation.

Our process

01

Survey and samples

Samples come first. A Cal/OSHA-certified asbestos consultant or technician, trained as an EPA Building Inspector, collects them from whatever your project will touch, and the lab analyzes them. We plan the work around the written result.

02

District notice and setup

Not every job needs the district notice. When one does, we send it online with the district notification fee, no later than 10 working days ahead of the work, and the work area is sealed before anything comes out.

03

Removal, waste and clearance

Friable asbestos waste stays sealed until a licensed hauler collects it as California hazardous waste, and the manifest is your proof it left. Clearance air testing is for an independent consultant to do, since California bars removal contractors from clearance air monitoring and we never test the air ourselves.

Serving Lakewood, California, Cerritos and Hawaiian Gardens

We also serve Cerritos and Hawaiian Gardens. Call us for confirmation if your address is outside the area.

Frequently asked questions

What does the owner-occupant rule allow?

A homeowner who lives in a single-unit house may do the renovation personally under the district’s rule, as long as the house is occupied and neither rented out nor used for business, and nobody else helps. The district advises against it, citing asbestos exposure and cross contamination. Demolition is not covered. A rental is not either, since the owner has to be living in the house and doing the work personally, and apartments, townhouses and condos are not single-unit dwellings. Please do not take samples yourself. Waste leaving the house stays under the rule.

What should a removal crew show me?

Ask for the Cal/OSHA registration before the crew gets the keys to a job of 100 square feet or more of asbestos-containing material, because the employer has to obtain it before the work starts. The Contractors State License Board does not allow asbestos-related work of that size unless the contractor holds a C-22 Asbestos Abatement classification or the qualifier passes an asbestos certification exam. It issues a C-22 only to a contractor registered with Cal/OSHA, so a current C-22 company also has a registration number to give you. Ask for the license number and check it.

What does a job cost?

The price depends on the material, the area, the access and whether the job needs the district notice. That notice comes with a district notification fee sized by the amount of asbestos removed. Testing and the clearance air test are priced apart from removal. Call us for a free, personalized estimate with no obligation.

Does a small job still need a survey?

Small jobs in a single-unit dwelling skip the survey when the renovation takes out or strips less than 100 square feet of asbestos-containing material, and measuring that amount takes a test. Apartments, townhouses, condos and demolitions are outside the break. Work practice and waste rules apply to every job either way.

Who tests the air when the work is done?

The air test belongs to an independent consultant. State law keeps removal contractors from any asbestos risk assessment, clearance air monitoring included, which means our crew never runs it. When the result comes back, we are glad to go through it with you.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 303-5293

Call (562) 303-5293